
Painting work
Fresh interiors, lasting finishes.
Interior and exterior painting, surface preparation, coatings and finishes. Primer through final coat, ready for hand-over.
Old buildings, full refurbishments, single-floor remodels. Vrone takes the whole job: every trade except electrical, coordinated by one site lead, delivered to a fixed scope and timeline.
Hand us the building and we hand it back finished. From stripping the interior to fitting the last door handle, our crews cover painting, flooring, tiling, drywall, deconstruction, carpentry, custom furniture, kitchen and bathroom installation, and complete door and window work. One partner, one site lead, one invoice, every trade on one timeline.

Fresh interiors, lasting finishes.
Interior and exterior painting, surface preparation, coatings and finishes. Primer through final coat, ready for hand-over.

Floors that last, laid by pros.
Hardwood, laminate, vinyl and resin floors. Subfloor preparation, levelling and installation across residential and commercial spaces.

Walls and floors, finished cleanly.
Wall and floor tiling for bathrooms, kitchens, hallways and commercial interiors. Cutting, layout, grouting and sealing handled in-house.

Full renovation, one crew.
Full renovation and installation of bathrooms and kitchens. Fittings, plumbing, tiling, cabinetry and finish work from one crew, on one timeline.

Build-outs, ready for paint.
Stud walls, partition systems, suspended ceilings and acoustic build-outs. Layout to skim-coat, ready for paint or finish.

Strip-out and clear, ready to build.
Strip-outs, interior demolition and waste removal. We open the shell so the new build can start, with debris cleared and the site protected.

Timber work, built to spec.
On-site carpentry, structural timber work, fitted joinery and trim. Built to the spec the project needs, finished to the standard the client expects.

Bespoke pieces, made to last.
Built-in wardrobes, shelving, vanities and bespoke pieces. Designed for the space, made to last, installed by the same crew.

Full install and renovation.
Full installation and renovation of doors and windows. Frame work, hanging, glazing, weatherproofing and finish, residential or commercial.
We visit the property, walk the scope with you, and translate it into a deployable spec: trades involved, sequence, headcount, and a realistic timeline.
Within one business day of the visit, you receive a written proposal: scope by trade, materials, mobilization plan, pricing and target completion date. No surprises.
Once you sign, we mobilize. Contracts, transport, accommodation, materials on site, and a Vrone site lead accountable for the whole job from day one.
Trades sequenced so the site keeps moving. Weekly check-ins, snag list before hand-over, and a clean, finished space at the end. You sign off, we close out.
We take on the whole renovation. One Vrone site lead is accountable for every trade on the job, the timeline, and hand-over. If you only need a single trade, we can scope that too, but the default is end-to-end delivery.
Not currently. Every other trade in a typical renovation is in scope: painting, flooring, tiling, drywall, deconstruction, carpentry, custom furniture, full bathroom and kitchen work, and complete door and window installation. We coordinate with a licensed electrician on your side or one we recommend locally.
Older residential buildings, apartments, commercial interiors and mixed-use properties. Full refurbishments, single-floor remodels, and targeted upgrades like kitchens, bathrooms, or window replacements across a whole building.
Across Europe, with crews mobilized from Portugal under EU posted-worker rules. Recent projects run in Portugal, Germany and the Netherlands. If your site is in another EU country, we will confirm coverage on the discovery call.
We quote a fixed proposal per project: scope by trade, materials, mobilization, and timeline. You receive a single transparent invoice rather than hourly billing across multiple sub-contractors.
After the site visit, we mobilize within days for smaller jobs and within one to two weeks for larger refurbishments. The proposal we send sets a realistic start date based on your timeline and ours.
We use essential cookies to make this site work. With your permission, we may also use analytics and marketing cookies to understand site usage and improve our services. See our Cookie Policy and Privacy Policy.